The length of time required to replace a hot water heater will vary with the installation requirements. Installing an expansion tank or replacing saddle valves can add time to the installation.
Usually we spend an average of 2-3 hours replacing a hot water tank. It will take more time to sweat copper piping but makes for a better connection with less chances of issues down the road.
Posted in: Installation